Seller signal · Permits family

Building permit data for real estate agents

Building permit data for real estate agents shows which parcels have work approved, what kind of work it is and whether it was ever closed out. Before They Sell reads City of San Diego approvals, groups them by their text, matches them to parcels and weights each group differently. Routine systems work carries no weight.

What is the building permit data signal?

The building permit data signal is a City approval, or an expired and unclosed approval, matched to a specific parcel.

Approvals are sorted into groups: pre-sale prep, remodel or addition, ADU, demolition or lot split, and solar or energy. Electrical, plumbing and mechanical permits are only candidates for pre-sale prep. The permit text decides: cosmetic or remodel scope stays, while like-for-like work such as a furnace, water heater or repipe is treated as maintenance and scores nothing. MEP permits that name an ADU or a conversion into units count as ADU work.

A stalled permit is a remodel, ADU or demolition approval that expired more than 90 days ago, and no more than 36 months ago, with no close date.

Why can building permit data point to a sale?

Building permit data can point to a sale because owners often put work into a home before changing what they do with it.

Cosmetic and remodel work is the kind of work that often goes in before a listing. A demolition or lot-split approval points to a redevelopment plan. An expired permit may mean an unfinished project, which can make a conversation about the home’s value timely. None of these shows that an owner has decided to sell.

How is building permit data scored?

Building permit data is scored by group, with newer approvals worth more than old ones.

Each parcel counts the strongest, most recent approval in each group once, so a run of re-roof permits does not pile up. Several permits of one kind approved on the same day read as a single phrase in the reason line.

Score weights for building permits
Score component Weight (pts) Half-life
Pre-sale prep permit approved 36 120 days
Demolition or lot-split permit approved 27 180 days
Permit expired with no close date 27 365 days
ADU permit approved 18 180 days
Remodel or addition permit approved 14 180 days
Solar or energy permit approved 3 180 days

Example: a 36-point “pre-sale prep permit approved” signal from 120 days ago counts 18 points today.

Try the scoring demo →

Where does building permit data come from?

The building permit data comes from the City of San Diego development permit approvals files, published by Development Services.

The City portal lists the dataset as updated daily. Where a row has a parcel number it is matched on that number; otherwise location or address is used. Rows that cannot be placed on a parcel are counted and left out. The permit holder’s name is not kept. The rules that read permit text are written patterns, not a model’s judgment.

Sources for building permits
SourceWhat it providesHow it joins to a parcelLimits
Approval type, scope text, issue, close and expiry dates, ADU unit counts
Parcel number, then location or address
Some rows have no parcel number, and many have no project type, so classification reads the approval type and scope text.

Weekly run, in a fixed order. A failed source is recorded and the rest of the run continues. All data sources.

What does an agent do with building permit data?

An agent uses building permit data to decide which parcels deserve a closer look and what a useful offer would be.

Open the source record, read the scope text and check the property. For a pre-sale prep permit, a short guide to which updates pay off is a natural offer. For a stalled project, an as-is versus finished comparison fits. Outreach never tells a homeowner that you saw a permit.

What are the limits of building permit data?

Building permit data misses unpermitted work and can misread permits that carry little or no description.

A permit with a blank description and no project text is treated as maintenance, which can under-count real preparation work. Some approvals lack a parcel number or project type. An approval shows that work was allowed, not that it happened.

See this signal across your San Diego territory

We walk through your planning areas, the sources that cover them and how each record would score.